Boat Building Forum

Find advice on all aspects of building your own kayak, canoe or any lightweight boats

Re: S&G methods
By:Tony
Date: 9/12/2000, 12:24 pm
In Response To: S&G methods (Kenny B)

: Has anybody tried and had any luck with tape instead of wire stiching

I tried to use tape (both duct tape and packing tape in between the wire. The tape let go when the sun warmed the glue (I was building outdoor with no cover) and also the glue stayed on after sanding and wiped down with alcohol -- what a mess. You may have better luck with name brand products; me, I'll stay away next time. Another way you may try is break-apart internal forms and strap clamps.

Messages In This Thread

S&G methods
Kenny B -- 9/11/2000, 8:48 pm
Re: S&G methods
Tony -- 9/12/2000, 12:24 pm
Re: S&G methods
Paul G. Jacobson -- 9/11/2000, 10:45 pm