Re: sheer clamp question/CLC Chesapeake 17
By:Brian C.
Date: 11/11/1998, 8:11 pm
Date: 11/11/1998, 8:11 pm
In Response To: sheer clamp question/CLC Chesapeake 17 (jim philips)
I set mine flush as well, the only snag that I am running into is that the _inside_ edge needs to be beveled at the bow and the stern, the trouble is that I already installed the deckbeams, the stock plans (Patuxent 19.5) have a extra deakbeam near the bow. So what I'll windup doing is building up the edges which will then get covered by the rubrail.
Messages In This Thread
- sheer clamp question/CLC Chesapeake 17
jim philips -- 11/11/1998, 8:11 pm- Re: sheer clamp question/CLC Chesapeake 17
BillThomas -- 11/23/1998, 9:34 pm- Re: sheer clamp question/CLC Chesapeake 17
Brian C. -- 11/11/1998, 8:11 pm- Re: sheer clamp question/CLC Chesapeake 17
Frank -- 11/12/1998, 12:49 am- Re: sheer clamp question/CLC Chesapeake 17
Don Herring -- 11/12/1998, 6:07 am- Re: sheer clamp question/CLC Chesapeake 17
Mark Bodnar -- 11/12/1998, 9:54 pm- Re: sheer clamp question/CLC Chesapeake 17
Bobby Curtis -- 11/12/1998, 7:14 pm- Re: Paint as filler
Timothy - Toronto, Ontario -- 11/12/1998, 8:51 am - Re: sheer clamp question/CLC Chesapeake 17
- Re: sheer clamp question/CLC Chesapeake 17
- Re: sheer clamp question/CLC Chesapeake 17
Shawn Baker -- 11/11/1998, 11:22 am - Re: sheer clamp question/CLC Chesapeake 17
- Re: sheer clamp question/CLC Chesapeake 17