S&G: WGW Construction Day 4
By:rb
Date: 2/2/2002, 7:07 pm
Date: 2/2/2002, 7:07 pm
My basement is getting warmer. I decided to check the butt joints tonight. They were cured and fine. I have finished the left side so let's do the same thing with the right side.
Today I went to Walmart and bought two measuring cups and more disposable foam brushes. The measuring cups are great. I will use one for hardener and one for resin and then empty the contents into my original measuring cup for stirring. I hope I'm doing this epoxy thing right because it feels like a piece of cake now. Tomorrow I will complete the butt joints and move over to drilling holes for the stitching wire.
Messages In This Thread
- S&G: WGW Construction Day 4
rb -- 2/2/2002, 7:07 pm- Re: S&G: WGW Construction Day 4 *Pic*
Canary -- 2/4/2002, 3:24 pm- Re: S&G: WGW Construction Day 4
rb -- 2/4/2002, 3:30 pm- Re: S&G: WGW Construction Day 4
Canary -- 2/4/2002, 4:19 pm
- Re: S&G: WGW Construction Day 4
- Re: S&G: WGW Construction Day 4
- Re: S&G: WGW Construction Day 4 *Pic*