S&G: hybrid construction techniques
By:joe
Date: 11/11/2002, 11:27 pm
Date: 11/11/2002, 11:27 pm
I'd like to start working on my second 'yak, and am considering a stripped deck on either a Squeedunk Cormorant or Cheseapeake 16'. What is the easiest method to go about stripping the deck? I'm assuming you'd use shear clamps, and use pkgng tape as a release over them. Attach temporary forms between the shears and strip away. Fiberglass the outside of the deck, remove from hull and then do the inside. Or is there a better way to do this?
Messages In This Thread
- S&G: hybrid construction techniques
joe -- 11/11/2002, 11:27 pm- Re: S&G: Hybrid Const. Pictorial
Rehd -- 11/12/2002, 12:12 am
- Re: S&G: Hybrid Const. Pictorial