Re: Strip: KayakFoundry strip built update...
By:Rick Sylvia
Date: 2/18/2003, 3:02 pm
Date: 2/18/2003, 3:02 pm
In Response To: Re: Strip: KayakFoundry strip built update... (Ross Leidy)
:Congrats - you get the coveted Cedar Guinea Pig award.
Ross, after having seen the level of your superior craftsmanship and dedication to boat building, I'll bet you actually build and present him with a cedar Guinea Pig!! (yep... that's a challenge) :-)
Rick
Messages In This Thread
- Strip: KayakFoundry strip built update... *LINK* *Pic*
srchr/gerald -- 2/17/2003, 6:05 pm- Look's great,thanks for the post *NM*
Don Lucas -- 2/18/2003, 10:19 am- Re: Strip: KayakFoundry strip built update...
Ross Leidy -- 2/17/2003, 11:59 pm- Re: Strip: KayakFoundry strip built update...
Rick Sylvia -- 2/18/2003, 3:02 pm- Re: Strip: KayakFoundry strip built update...
srchr/gerald -- 2/18/2003, 5:46 pm
- Oh wow!!!...
srchr/gerald -- 2/18/2003, 11:29 am - Re: Strip: KayakFoundry strip built update...
- Re: Strip: KayakFoundry strip built update...
Roger Nuffer -- 2/17/2003, 7:49 pm- Re: Strip: KayakFoundry strip built update... *LINK* *Pic*
srchr/gerald -- 2/17/2003, 8:57 pm
- Re: Strip: KayakFoundry strip built update...
- Look's great,thanks for the post *NM*