Re: Epoxy: the dreaded runs...
In Response To: Re: Epoxy: the dreaded runs... (Todd Sullivan)
I apply epoxy using a bristle brush. I apply it over a 2 to 3 foot long section with horizontal strokes working from keel line to sheer line or center deck to sheer line. Then I brush it out on both diagonals and finally I smooth it out with horizontal strokes, always working from a wet area to a dry area. I apply it fairly thickly and hardly ever have any runs at all. This is using West System 105/207 which I would classify as a "medium" speed hardener and I work in a heated shop.
Glen in Baie-St-Paul.
Messages In This Thread
- Epoxy: the dreaded runs...
Todd Sullivan -- 3/25/2008, 9:22 pm- Re: Epoxy: the dreaded runs...
Pedro Almeida -- 3/26/2008, 8:16 pm- Re: Epoxy: taping seams and rollers *LINK*
Rod Tait -- 3/26/2008, 10:38 am- Re: Epoxy: the dreaded runs...
Etienne Muller -- 3/26/2008, 6:58 am- Re: Epoxy: the dreaded runs...
Todd Sullivan -- 3/26/2008, 8:41 am- Stop now. You're done.
Paul G. Jacobson -- 3/27/2008, 6:48 pm- Re: Stop now. You're done.
Acors -- 3/28/2008, 5:17 pm- Re: Stop now. You're done.
Todd Sullivan -- 3/28/2008, 10:15 am - Re: Stop now. You're done.
- Re: Epoxy: the dreaded runs...
Glen Smith -- 3/26/2008, 10:08 am - Re: Stop now. You're done.
- Stop now. You're done.
- Re: Epoxy: the dreaded runs...
Jesper B -- 3/26/2008, 5:16 am- Re: Epoxy: the dreaded runs...
Greg Clopton -- 3/26/2008, 12:29 am- Re: Epoxy: the dreaded runs...
Pedro Almeida -- 3/26/2008, 8:35 pm- Re: Epoxy: the dreaded runs...
Bill Hamm -- 3/27/2008, 7:18 am
- Re: Epoxy: the dreaded runs...
- Re: Epoxy: the dreaded runs...
Michael McCluskey -- 3/25/2008, 9:50 pm - Re: Epoxy: taping seams and rollers *LINK*
- Re: Epoxy: the dreaded runs...