Date: 5/7/2010, 12:27 pm
: How integrated is the internal
: strongback approach in Nick's plans for the Night Heron and
: Petrel?
All you need to do is draw a uniform datum on to the plans. That will be the top surface of the strongback. Take the waterline drawn on the station form (or something parallel) and draw an offset that clears the highest point of all the forms. The tallest point is usually one of the stems or at the cockpit. The offset is usually a nice even amount: like 8 inches or say 200mm. You can often just use one of the page borders (ala Bjorn Thomasson). Just make sure you use the reference line and use the same offset for each form. The ends are similar.
If you're only planning to build one or two boats, the internal SB works fine. In in doubt follow whatever the designer recommends.
Messages In This Thread
- Strip: Schedule 40 drain pipe as strongback
Eric Anderson -- 5/3/2010, 1:44 pm- If you're up for a challenge.. *PIC*
Simeon -- 5/4/2010, 7:33 pm- Re: If you're up for a challenge.. *PIC*
Dan Caouette (CSFW) -- 5/5/2010, 8:18 am- Re: If you're up for a challenge..
Ken Blanton -- 5/5/2010, 10:40 pm- Re: If you're up for a challenge..
Eric Anderson -- 5/6/2010, 8:18 pm- Re: If you're up for a challenge.. *PIC*
Dan Caouette (CSFW) -- 5/7/2010, 9:22 am- Re: If you're up for a challenge..
Eric Anderson -- 5/7/2010, 11:13 am- Re: If you're up for a challenge..
Dan Caouette (CSFW) -- 5/7/2010, 12:27 pm
- Re: If you're up for a challenge..
- Re: If you're up for a challenge..
Paul G Jacobson -- 5/7/2010, 9:13 am - Re: If you're up for a challenge..
- Re: If you're up for a challenge..
- Re: If you're up for a challenge..
Ken Blanton -- 5/4/2010, 10:50 pm- Re: If you're up for a challenge..
Simeon -- 5/5/2010, 12:09 am
- Re: If you're up for a challenge..
- IMO ... Use An External Strongback
Ken Blanton -- 5/4/2010, 7:13 pm- Re: Strip: Schedule 40 drain pipe as strongback
Bill Hamm -- 5/4/2010, 1:40 am- Re: Strip: Schedule 40 drain pipe as strongback
Mike -- 5/4/2010, 4:17 pm- Re: Strip: Schedule 40 drain pipe as strongback
Bill Hamm -- 5/5/2010, 1:51 am
- Re: Strip: Schedule 40 drain pipe as strongback
- Re: Strip: Schedule 40 drain pipe as strongback
PatrickC -- 5/3/2010, 11:08 pm- Re: Strip: Schedule 40 drain pipe as strongback
Brian Nystrom -- 5/3/2010, 9:57 pm- Re: Strip: Schedule 40 drain pipe as strongback
Paul G Jacobson -- 5/3/2010, 5:33 pm- Re: Strip: Schedule 40 drain pipe as strongback
Eric Anderson -- 5/3/2010, 9:17 pm- Re: Strip: Schedule 40 drain pipe as strongback
Paul G Jacobson -- 5/4/2010, 4:49 am- Re: Strip: Schedule 40 drain pipe as strongback
Ian Johnson -- 5/6/2010, 7:17 am- Re: Strip: Schedule 40 drain pipe as strongback
Bill Hamm -- 5/6/2010, 1:27 pm
- Re: Strip: Schedule 40 drain pipe as strongback
- rigid strongback, align forms
mike allen -- 5/4/2010, 2:41 am- Re: rigid strongback, align forms *PIC*
Ian Johnson -- 5/6/2010, 7:15 am
- Re: Strip: Schedule 40 drain pipe as strongback
Mike Bielski -- 5/3/2010, 9:48 pm - Re: Strip: Schedule 40 drain pipe as strongback
- Re: Strip: Schedule 40 drain pipe as strongback
- Re: Strip: Schedule 40 drain pipe as strongback
Ian johnson -- 5/3/2010, 4:01 pm - Re: If you're up for a challenge.. *PIC*
- If you're up for a challenge.. *PIC*