Re: Strip: new build is coming along
In Response To: Strip: new build is coming along *PIC* (robert l)
: I have finished striping the hull of the Tuxedo, including a
: herringbone pattern along the keel and pinstripes below the
: sheer line. I skipped bead and cove and went with beveling the
: strips and this is done without staples.
: This is going very well and I hope to have the hull glassed by the
: end of next week. The canoe on the other hand is taking forever,
: Does anybody know a great way to sand the inside of a canoe????
: Robert, Visionary
Foam pad on a random orbit sander, allows the disc to flex to handle the curves.
Bill H.
Messages In This Thread
- Strip: new build is coming along *PIC*
robert l -- 5/27/2012, 10:28 pm- Re: Strip: new build is coming along
Bill Hamm -- 5/28/2012, 1:58 am- Re: Strip: new build is coming along
george jung -- 5/28/2012, 11:09 pm
- Re: Strip: new build is coming along
- Re: Strip: new build is coming along