: I'm hoping to start my next boat in the next week or 2. I'll be
: building at TechShop, an open access shop. I may have to move my
: boat around the shop while stripping. Definitely not a good
: idea, but how much of a bad idea is it? I can carefully re-level
: everything each time it might be moved. I guess I could build a
: super rigid movable cart for my strongback, but that seems like
: a lot of trouble & expense for maybe not much benefit.
: Thoughts??
: Thanks!
The leveling process is only to ensure that eveything is dead true.
Once you have run two or three strips around the sheer line,
the whole thing should be rigid and stiff enough to pick up
and carry without distortion.
Les C.
Messages In This Thread
- Strip: Moving stripper during consturction?
Chuck Smith -- 8/25/2012, 9:45 am- Re: Strip: Moving stripper during consturction?
Malcolm Schweizer -- 8/25/2012, 10:42 am- Re: Strip: Moving stripper during consturction?
Marc Upchurch -- 8/25/2012, 1:06 pm- Re: Strip: Moving stripper during consturction? *PIC*
danperry -- 8/25/2012, 10:27 pm- Re: Strip: Moving stripper during consturction?
Marc Upchurch -- 8/26/2012, 8:50 am- Re: Strip: Moving stripper during consturction?
Chuck Smith -- 8/26/2012, 10:20 pm - Re: Strip: Moving stripper during consturction?
- Re: Strip: Moving stripper during consturction?
- Re: Strip: Moving stripper during consturction?
Les Cheeseman -- 8/26/2012, 2:18 am- Re: Strip: Moving stripper during consturction?
danperry -- 8/26/2012, 11:38 am- Re: Strip: Moving stripper during consturction?
Etienne Muller -- 8/26/2012, 2:04 pm
- Re: Strip: Moving stripper during consturction?
- Re: Strip: Moving stripper during consturction?
Chuck Smith -- 8/26/2012, 10:16 pm - Re: Strip: Moving stripper during consturction?
- Re: Strip: Moving stripper during consturction?